✍️ Day Summary
I updated the daily diary pipeline to process historical data from August 2025 through June 2026. I also implemented new features for calculating various auspicious timings in the panchanganga section. Finally, I added solar masa information to the main panchanganga response.
📊 Daily Overview
Total Activity: 24 commits + 5 merges across 3 repositories
🚀 GitHub Activity
1. WorkTracker — 18 commits
feat(diary): multi-stream work diary writing into Obsidian Calendar · f60cf0a
Reads gstack streams (skill-usage, eurekas, decisions, ceo-plans), the
Obsidian vault git log for notes, and authored commits across every
GitHub repo the PAT can see via /search/commits (53 repos discovered,
no enrollment list). …
Vault sync: backfilled diary entries 2025-08..2026-06 · eafe47a
Result of running the new scripts/diary pipeline over 299 days of
history (2025-08-21..today). 283 daily entries regenerated in the
Obsidian vault from 1663 commit events across 53 repos plus all
gstack signals, then propagated here via vault sync for Quartz publish.
feat(diary): daily launchd scheduler + sync path fixes + calc-issues doc · 2a4e7c7
Pipeline (runs nightly 23:00 IST via dev.tathya.diary launchd job):
- pre-flight: abort if either repo has staged work or is mid-merge
- bun run scripts/diary/build.ts —backfill -7d..today —narrate
- commit Obsidian Calendar/ if changed (no push)
- …
feat(diary): full automation — daily.sh pushes both repos; remove preview path · 352583d
Daily orchestrator now does the full loop:
build → commit Obsidian → sync to WorkTracker → commit WorkTracker → push bothPush is safe-by-construction:
- fetch origin first
- push only if local is strictly ahead of remote (fast-forward)
- if diverged (remote has new commits we don’t), bail with a clear log…
feat(diary): fix C1-C6 calc issues; vault holds data; CI publishes; gc script · bcf2f71
Calculation fixes (per scripts/diary/CALCULATIONS.md):
- C1: Two metrics now — “Active days (substantive)” counts only commit/
decision/eureka/plan; “Days with any signal” includes notes + skill runs.
One note-touch day no longer equals a 14-commit day.- C2: “Skill runs (since YYYY-MM-DD)” labels the metric with t…
fix(diary): github fetch covers full history regardless of backfill window · edb3836
The previous behaviour was: backfill —7d..today → github fetch only the
last 7 days → running totals + curriculum saw 7 days of data and showed
laughably small numbers (e.g. “1,536 commits all-time” became “146
commits” when you re-ran June only).…
…and 12 more commits in this repo.
2. astroacharya 🔒 — 5 commits + 5 merges
feat(panchanga): add solar masa to /panchanga response (#11 item 8) · 245c9b7
Adds
masa: { name, nameHi, paksha_reckoning, source }to both
/panchanga and /panchanga/daily responses. Uses the solar convention
(sankranti-anchored, sun rashi → masa name) — the simpler-of-two
canonical conventions. Each masa = 30° of sun longitude.…
feat(muhurta): slice 2c — Godhuli + Choghadiya + Dishaashool (#11 items 5/6/7) · 4d70e97
Three new muhurat-shastra computations added to /muhurta response.
All three are classical non-BPHS — sources documented inline + on
each response field. None require Vipin sign-off; tables match the
most-widely-published variants across Muhurta Chintamani, Drik
Panchang, and Hindi-tradition almanacs.…
feat(muhurta): slice 2d — Amrit + Sarvartha Siddhi yogas (#11 items 2/3) · ddf898e
Vipin clarified both are “yoga, timing-based, auspicious while the
moon stays in the qualifying nakshatra” — promotes them to dedicated
combination_yogas with explicit start/end timings instead of binary
festival flags.…
feat(muhurta): slice 2d.2 — Varjyam from VK Shridhar table (#11 item 1) · f3f8a58
Vipin chose VK Shridhar’s published tyajya-ghati table on 2026-06-16
(saptarishisshop.com). 27-entry per-nakshatra mapping. 1 ghati =
24 min; tyajya start = (start_ghati - 1) × 24 minutes from nakshatra
start; duration = (end_ghati - start_ghati + 1) × 24 min, typically
96 min (4 ghatis).…
feat(panchanga,muhurta): slice 2d.3 — Durmuhurta multi-school + Tithi/Karana rulers (#11 items 4/10) · c56382b
Two parallel additions, both grounded in Vipin’s 2026-06-16 calls.
──── Item 4: Durmuhurta (multi-school) ─────────────────────────────
Vipin: “lets show all per the different traditions, we will ask for
review”. So we ship 3 schools side by side:…
Merges:
- Merge pull request #15 from Rupali59/feat/slice-2d-siddhi-yogas
- Merge pull request #17 from Rupali59/feat/slice-2d-durmuhurta-graha
- Merge pull request #13 from Rupali59/feat/slice-2b-masa-festivals
- Merge pull request #14 from Rupali59/feat/slice-2c-godhuli-choghadiya-dishaashool
- Merge pull request #16 from Rupali59/feat/slice-2d-varjyam
3. Obsidian 🔒 — 1 commits
feat(calendar): backfill 283 entries via new diary pipeline (2025-08..2026-06) · 57a239e
Generated by WorkTracker/scripts/diary/ — fuses commits across 53
GitHub repos (via /search/commits, no enrollment) with gstack signal
(skill-usage, eurekas, decisions, ceo-plans) and this vault’s git log
of touched notes. Output matches Templates/daily-calendar.md.…
📈 Development Analytics
Daily Summary
| Metric | Today |
|---|---|
| Commits | 24 |
| Merges | 5 |
| Skill runs | 0 |
| Decisions | 0 |
| Eurekas | 0 |
| CEO plans | 0 |
| Notes touched | 0 |
Decisions logged today
None today.
Eurekas
None today.
Strategic plans authored
None today.
Notes touched
None today.
Running totals (as of this date)
Active days last 90: 66 / 90 (substantive)
Days with any signal last 90: 69 / 90
Skill runs (since 2026-03-25): 75
Commits this year (authored): 1263
Decisions logged this year: 4
Eurekas this year: 5
CEO plans authored this year: 13
Projects touched this year: 55
Top projects last 90: VipinKaushik (26d), portfolio (23d), astroacharya (15d), Mothership (15d), vipin-kaushik-content (12d)
💭 My Notes
[Your own thoughts, observations, or context for this day — this section is never overwritten by automation]