📊 Daily Overview
Total Activity: 6 commits + 4 merges across 2 repositories
🚀 GitHub Activity
1. vipin-kaushik-content 🔒 — 5 commits + 3 merges
chore(prashna): hard retire from product vocabulary · 02554d2
Affects: workspace, VipinKaushik, VipinKaushik-mb, astroacharya
Prashna is removed as a client-facing service tier, as a backend collection
/ queue / dashboard surface, and as a future feature ambition. The term
never matched the actual offering: lib/pricing.ts exposes only Consultation
(15/30 min) + Vastu. Prashna was never priced, client-named, or
user-tested. Vipin had previously signalled “technical names confused him;
Prashna deferred” (DECISIONS 2026-03-19); this formalises the retirement.…
docs(env): plan + state + DECISIONS for VipinKaushik env propagation phase 1 · 74be804
Affects: VipinKaushik
Workspace-side artifacts for the VK env-propagation work that lands as the
companion VipinKaushik PR.
- docs/plans/2026-06-11-env-propagation-vk-scoped.md: revised plan after
the original 4-phase vercel-mb proxy architecture was reviewed by a
Claude adversarial subagent and judged cargo-cult. Single-phase VK-scoped
change instead: vercel.env.example + prebuild lint +vercel env pull
for the local-dev banner fix. …
docs(vipin): cta stance — visible, not urgent, embedded Affects: VipinKaushik, Astroclarity · a8e9505
Supersedes the ‘never advertised’ framing on VIPIN.md:214 which (a) had
drifted from reality — the V1 production hero shipped a primary
‘Book a consultation →’ CTA on 2026-05-31 (commit 45c5bc0) — and
(b) read as hidden rather than restrained, making every booking-path
improvement a re-litigation.New stance: three required properties.
- visible: one primary CTA above the fold, repeated discreetly at
decision points (Pricing, optionally FAQ). Path obvious, verb neutral.- not urgent: forbids countdowns, scarcity, decision-moment alerts,
exit-intent popups, ‘first call free’, ‘limited time’. …
docs(measurement): add SkyMandala exploration events to §6.3 · 2834d4f
Replace the earlier umbrella
panchanga_interact {action}plan with five
granular events covering homepage panchang/wheel exploration. Granular
events let GA4 funnel reports answer “did exploration precede booking”
without parsing a string param.Events: mandala_graha_select, mandala_aspecter_change, mandala_date_change,
mandala_location_change, panchang_element_open.Wired in VipinKaushik/lib/analytics.ts + call sites (commit be052a9).
docs(measurement): reverse GA4 canonical to G-LTV3S4SEGH · 195d5b7
Updates MEASUREMENT.md (architecture diagram, GSC link target, admin
checklist, §11 open question, revision log), DECISIONS.md (appended
2026-06-11 reversal with Affects tag), and TODOS.md (GSC dependency).Code-side swap landed in VipinKaushik production branch.
Merges:
- Merge pull request #15 from Rupali59/chore/env-propagation-phase1
- Merge pull request #16 from Rupali59/docs/cta-stance-visible-embedded
- Merge pull request #14 from Rupali59/chore/prashna-hard-retire
2. astroacharya 🔒 — 1 commits + 1 merges
docs(state): 2026-06-11 sweep — link CACHE-A1/A2 to learnings + VK PR #74 note · 0e9d704
- Cross-ref CACHE-A1/A2 to the three gstack learnings that codify their
invariants (cache-control-immutable-defeats-etag,
bake-ext-version-into-etag-for-determinism,
quantize-continuous-cache-keys-at-boundary). Learnings predate but
weren’t linked from STATE.md.- Record the consumer-side cleanup in Completed: VK PR #74 deletes the
dead /api/astrology/planets surface (no astroacharya code change; just
less duplicated caching on the consumer side; capacity unaffected).- Refresh Last updated to 2026-06-11.
Merges:
- Merge pull request #10 from Rupali59/docs/state-2026-06-11-sweep
📈 Development Analytics
Daily Summary
| Metric | Today |
|---|---|
| Commits | 6 |
| Merges | 4 |
| Skill runs | 0 |
| Decisions | 0 |
| Eurekas | 0 |
| CEO plans | 0 |
| Notes touched | 0 |
Decisions logged today
None today.
Eurekas
None today.
Strategic plans authored
None today.
Notes touched
None today.
Running totals (as of this date)
Active days last 90: 66 / 90 (substantive)
Days with any signal last 90: 69 / 90
Skill runs (since 2026-03-25): 75
Commits this year (authored): 1230
Decisions logged this year: 0
Eurekas this year: 5
CEO plans authored this year: 13
Projects touched this year: 54
Top projects last 90: VipinKaushik (24d), portfolio (23d), Mothership (16d), astroacharya (14d), motherboard-shared (10d)
💭 My Notes
[Your own thoughts, observations, or context for this day — this section is never overwritten by automation]